73
|
|
TYPICAL PHOTOGRAPHS
The photographs on the following pages have been selected from the 135-plus rolls of documentation photographs. The ship's restoration progress was photo-documented by the ship's curatorial crew on a daily basis using black-and-white, panchromatic film. These selections have been made to be representative of the work and progress and are by no means to be considered a summary of the more than 4,700 photographs in the collection.
|
74
|
|

12/29/88 removing concrete overlay on main deck

12/29/88 removing concrete overlay on main deck
|
75
|
|

12/20/88 welded inserts on navigation bridge

12/28/89 steel deck beneath concrete
|
76
|
|

12/22/88 01 level starboard after concrete removed

12/21/88 starboard bottom keel & rudder fr 126
|
77
|
|

12/27/88 removing concrete overlay on main deck

12/21/88 port bottom keel & rudder fr 126
|
78
|
|

12/21/88 starboard underwater hull along centerline
forward from fr 117

12/21/88 port underwater hull along centerline
toward stern from fr 26
|
79
|
|

12/21/88 starboard underwater hull along centerline
forward from fr 27

12/21/88 port underwater hull along center line
toward stern from fr 110
|
80
|
|

12/21/88 port underwater hull along center line
toward stern from fr 75

12/21/88 center bow, keel to bow point
|
81
|
|

12/21/88 port bow, keel to bow point

12/21/88 starboard bow, keel to bow point
|
82
|
|

12/21/88 portside underwater hull between 2nd & 3rd docking
keels toward stern from fr 76

12/22/88 starboard underwater hull between 2nd & 3rd docking
keels toward bow from fr 88
|
83
|
|

12/22/88 starboard underwater hull between 1st & 2nd docking keels toward bow from fr 32

1/24/89 removals from portside hull exposing frames 17-18-19
|
84
|
|

1/24/89 ultrasonic survey markings on starboard rudder & skeg

1/24/89 ultrasonic survey markings & damage at fr 60
starboard torpedo blister
|
85
|
|

1/25/89 panels removed from main battery control overhead

1/25/89 ultrasonic survey markings starboard bow to fr 17
|
86
|
|

1/25/89 ultrasonic survey markings starboard stern

1/25/89 plating removals mainmast
|
87
|
|

1/26/89 smoke stack umbrella removed

1/26/89 ultrasonic survey markings main deck stern
|
88
|
|

1/31/89 heating coils in place fr 87-89

1/31/89 new grating in secondary battery control tower
|
89
|
|

2/1/89 markings for plate renewal, main deck stern

2/9/89 main deck plate removals on centerline
forward of mainmast
|